Skip to main content
SinterWorks Logo
SinterWorks Technology

PM Material Comparator

Compare material grades side by side and estimate your part costs

Material Comparator

Compare up to 4 powder metallurgy materials side by side

Quick Cost Estimator

Approximate pricing for budget planning only

100g

Estimated Costs

Unit Price$33.750
Total Order (20,000 pcs)$675,000

Tooling (one-time)$12,000
Production Lead Time4-6 weeks
Samples2-3 weeks for first article samples
This is a rough estimate for budgeting. Actual pricing requires a formal quote based on drawings and specifications.
Get Accurate Quote

How PM Parts Are Made

Our end-to-end powder metallurgy manufacturing process, from raw powder to finished precision components

Step 1

Powder Blending

Base metal powders are precisely blended with alloying elements (copper, nickel, graphite) and lubricants. Particle size and composition are controlled for consistent flow and compaction behavior.

Step 2

Compacting

Blended powder is fed into precision tooling and compacted under 200-800 MPa pressure. Hydraulic presses (up to 800T) form the 'green' part to near-net shape with controlled density distribution.

Step 3

Sintering

Green parts are heated to ~1,120°C in controlled-atmosphere furnaces. Metal particles bond through diffusion, eliminating porosity and achieving 90-98% theoretical density. Belt speeds are calibrated for optimal grain structure.

Step 4

Sizing & Coining

Sintered parts are re-pressed in precision sizing dies to achieve GB6-GB9 gear tolerances. Coining can densify surfaces for improved fatigue resistance and dimensional accuracy.

Step 5

Secondary Operations

Heat treatment (carburizing, carbonitriding, induction hardening), CNC machining, steam treatment, oil impregnation, and surface finishing as required by the application specification.

Step 6

Inspection & Delivery

CMM dimensional verification, gear testing, metallurgical analysis, and PPAP documentation. Parts are packaged per export standards and shipped globally within 4-6 weeks of production order.

Need PM material advice?

Chat with our expert — free & instant